Events


10th G Club Bahang Ride - 14/3/10

14 Mar 2010 07:30

After missing last month's Bahang Ride due to CNY, our next Bahang Ride will be held on the following date :-

Date : 14th March 2010

Time : 7.30am

Meeting point : G Hotel main entrance(N5°26.269' E100°18.622').

All are welcome.

View our Trail section for more details

Captain - Posted on 01 March 2010

Perlis Mountainbike Jamboree 2010 - RIDE UP NORTH

14 Mar 2010 08:00

Date: 14 Mar 2010

Meeting time: 0800 hours

Meeting place: Politeknik Tuanku Syed Sirajuddin (N6° 27.056' E100° 20.350')

Contact: Visit http://perlismtb.com for details.

Description:  Visit http://perlismtb.com/blog/?page_id=636 for details.

 

turbosnail - Posted on 15 November 2009

Sungai Lembing Mountain Bike Challenge, 19-21 March 2010

19 Mar 2010
21 Mar 2010

THIS IS AN MTB RACE!

 

Deadline is 1 March 2010.  So be quick if you want to take part.  Registration fee is RM65 for each category. 

 

For more info, visit http://www.arineenadventures.com/slmtb-challenge/

turbosnail - Posted on 20 February 2010

SGA MTB Ride - 1200 steps or "cheng gee chang", 21 Mar 2010, 0715 hours

21 Mar 2010 07:15
21 Mar 2010 10:15

Date: 21 Mar 2010

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple).  The climb could be overwhelmed fosome.  Ride duration could take more than 2 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Pulau Betong Eco Ride 21 Mar by Rotary Club Of Tg Bungah - Grade 2 (easy to moderate ride)

21 Mar 2010 07:30
21 Mar 2010 10:30

Place;   Pulau Betong Village Trail

Time ;  0730 am, 21st, March 2010

Meeting Place;  Pulau Betong Kopitiam (N5° 18.308' E100° 11.672')

Description of Ride;  Easy to moderate ride; Good initiation ride for first timers and those wanting to hv a trial of riding. Flat terrain and will be riding along the coast, mangrove swamps, padi fields and fishing villages; Distance about 40 Km.  FOR PHOTOS OF THE RIDE, PLS REFER TO GALLERY ON "PULAU BETONG - PANTAI ACHEH ".

look368 - Posted on 03 March 2010

JOM KAYUH 1 MALAYSIA , 27-28 March 2010

27 Mar 2010 06:30
28 Mar 2010 20:00

Some sort like fellowship ride.  No closing date is given.  Think you can register on the spot.  Please refer to below or the link for details:

 

JOM KAYUH 1 MALAYSIA

------------------------

turbosnail - Posted on 21 February 2010

Full Moon Round Island Ride, 27th March 2010

27 Mar 2010 19:15

Dear members,

To all you night riding fans, the 2nd Full Moon Ride is coming.  Get your blinkers and lights ready because we are going for an exciting ride. We will be joining other riders from Bayan Baru.

 

Event :  Full Moon Round Island Night Ride

Date :  27th March 2010 (Saturday)

Meeting Place 1:  1915hrs in front of Island Plaza (Tg. Tokong)

nightrider - Posted on 05 March 2010

SGA MTB Ride - Blue House, 28 Mar 2010, 0745hours

28 Mar 2010 07:45

Date: 28 Mar 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.  Details of the trail can be found here:  http://www.pbb.com.my/node/464

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Deadline for PCC IS2010 registration

30 Mar 2010

This is the deadline for IS2010 registration.  For details of event please visit http://www.pbb.com.my/node/666#comment-2083

turbosnail - Posted on 05 March 2010

Registration Deadline for Kayuh Bendang 2010

1 Apr 2010 00:00
2 Apr 2010 00:00

http://www.pbb.com.my/node/800

turbosnail - Posted on 26 February 2010

SGA MTB Ride - Ngor Hean temple, 04 Apr 2010, 0720 hours

4 Apr 2010 07:20

Date: 04 Apr 2010

Meeting time: 0720 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding up to Air Itam Dam and then to a temple in the middle of fruit orchard in the vicinity of Air Itam Dam forest reserve.  The trail grade is to be moderate with few slope that could be challenging for some.   Ride duration should in between 1.5 to 2.5 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Kayuh Bendang 2010 - 0730 hours, 11 April 2010

11 Apr 2010 07:30

Info remains sketchy.  Do contact the following for info.  You can also click the imej to download the participation form.

1. Mohammad bin Saud - 019 - 4589908
2. Mohamad Shukri - 017 - 4433660 (Fax:3244344)

Deadline: 1 April 2010

turbosnail - Posted on 26 February 2010

SGA MTB Ride - Bangalow, 18 Apr 2010, 0745 hours

18 Apr 2010 07:45

Date: 18 Apr 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  This not an easy ride.  You are riding up to a peak that is close to Malihome Bungalow on cemented singletrack.  One of the toughest trails to ride in Sungai Ara Farmer Trail system.  But you will be rewarded with the breathtaking view to Balik Pulau and Bayan Baru areas.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Janamanjung Fellowship Ride 2010, 0700 hours, 25/04/2010

25 Apr 2010 07:00

 

 

turbosnail - Posted on 04 January 2010

SGA MTB Ride - Gertak Sanggul, 25 Apr 2010, 0715hours

25 Apr 2010 07:15

Date: 25 Apr 2010

Meeting time: 0715 hours

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

PCC Interstate Road Ride 2010, 30 April - 2 May 2010

30 Apr 2010
2 May 2010

The route is confirmed.  Please refer to below for details:

Day 1 Kuala Kangsar to Tasik Banding (145km approx)

Day 2 Tasik Banding to Kota Baru (180km approx)

Day 3 Kota Baru to Tasik Kenyir (175km approx)

Fees:  RM400.00 per head.  RM150 per head for children age from 4 to 12 yrs old.  RM100.00 extra per head if you require bus ride back to starting point after the ride.

Payment: Cheque or TeleTransfer (TT) Payable To "Soh Tze Hong" Maybank Berhad A/C No : 114133088434

turbosnail - Posted on 16 January 2010

Kulim Jamboree - 1/5/10

1 May 2010 20:30

For those of you keen on riding off road at night with some goodies thrown in. this is your chance.

For details, go here : http://www.kulimjamboree.co.cc/

G Club

Captain - Posted on 04 January 2010

SGA MTB Ride - Carpet aka Secret Garden, 02 May 2010, 0745hours

2 May 2010 07:45

Date: 02 May 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Jamboree MTB Jasin 2010, 0800 hours, 02 May 2010

2 May 2010 08:00
2 May 2010 17:00

For more info about this 50km MTB ride event, please visit the official link:  JAMBOREE MTB JASIN 2010

The ride is said to be going through various terrainswith different levels of difficulties.

Registration fees:

Before 2 April 2010: RM50.00 per head

After 2 April 2010:  RM60.00 per head

No deadline for registration is given. 

Payment can be made via CIMB 04070013430527. Account name: Bendahari Belia 4B Air Barok Jasin.

turbosnail - Posted on 20 February 2010

SGA MTB Ride - 1200 steps or "cheng gee chang", 16 May 2010, 0715 hours

16 May 2010 07:15

Date: 16 May 2010

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple).  The climb could be overwhelmed for some.  Ride duration could take more than 2 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Blue House, 23 May 2010, 0745hours

23 May 2010 07:45

Date: 23 May 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.  Details of the trail can be found here:  http://www.pbb.com.my/node/464

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Ngor Hean temple, 30 May 2010, 0720 hours

30 May 2010 07:20

Date: 30 May 2010

Meeting time: 0720 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding up to Air Itam Dam and then to a temple in the middle of fruit orchard in the vicinity of Air Itam Dam forest reserve.  The trail grade is to be moderate with few slope that could be challenging for some.   Ride duration should in between 1.5 to 2.5 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Happy To Ride 2010 - Ipoh Jamboree, 30 May 2010

30 May 2010

 

This is not KRI's Ipoh Fellowship Ride but organized by different group of cycling enthusiasts.

Entry fee to be RM50 per head.  Deadline: 14 May 2010.

Sketchy details. Do visit their blogspot for updates, http://happytoride-ipohjamboree2010.blogspot.com/

turbosnail - Posted on 24 January 2010

SGA MTB Ride - Bangalow, 06 Jun 2010, 0745 hours

6 Jun 2010 07:45

Date: 06 Jun 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  This not an easy ride.  You are riding up to a peak that is close to Malihome Bungalow on cemented singletrack.  One of the toughest trails to ride in Sungai Ara Farmer Trail system.  But you will be rewarded with the breathtaking view to Balik Pulau and Bayan Baru areas.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Gertak Sanggul, 20 Jun 2010, 0715hours

20 Jun 2010 07:15

Date: 20 Jun 2010

Meeting time: 0715 hours

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Carpet aka Secret Garden, 27 Jun 2010, 0745hours

27 Jun 2010 07:45

Date: 27 Jun 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - 1200 steps or "cheng gee chang", 04 Jul 2010, 0715 hours

4 Jul 2010 07:15

Date: 04 Jul 2010

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple).  The climb could be overwhelmed for some.  Ride duration could take more than 2 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

KRI's Ipoh Century Ride 2010

17 Jul 2010

No further info about this single day event yet.  Route distance is as implied, 100 miles( or 160km if you are imperial unit retarded...;)).  The tentative date is set on the 18 of July, 2010.  I will update the info about this event from time to time.

KRI Cycling website: http://www.kricycling.com/

NOTE:  This is a roadie event.

turbosnail - Posted on 28 January 2010

SGA MTB Ride - Blue House, 18 Jul 2010, 0745hours

18 Jul 2010 07:45

Date: 18 Jul 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.  Details of the trail can be found here:  http://www.pbb.com.my/node/464

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Ngor Hean temple, 25 Jul 2010, 0720 hours

25 Jul 2010 07:20

Date: 25 Jul 2010

Meeting time: 0720 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding up to Air Itam Dam and then to a temple in the middle of fruit orchard in the vicinity of Air Itam Dam forest reserve.  The trail grade is to be moderate with few slope that could be challenging for some.   Ride duration should in between 1.5 to 2.5 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Bangalow, 01 Aug 2010, 0745 hours

1 Aug 2010 07:45

Date: 01 Aug 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  This not an easy ride.  You are riding up to a peak that is close to Malihome Bungalow on cemented singletrack.  One of the toughest trails to ride in Sungai Ara Farmer Trail system.  But you will be rewarded with the breathtaking view to Balik Pulau and Bayan Baru areas.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Gertak Sanggul, 15 Aug 2010, 0715hours

15 Aug 2010 07:15

Date: 15 Aug 2010

Meeting time: 0715 hours

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Carpet aka Secret Garden, 22 Aug 2010, 0745hours

22 Aug 2010 07:45

Date: 22 Aug 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - 1200 steps or "cheng gee chang", 29 Aug 2010, 0715 hours

29 Aug 2010 07:15

Date: 29 Aug 2010

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple).  The climb could be overwhelmed for some.  Ride duration could take more than 2 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Blue House, 05 Sep 2010, 0745hours

5 Sep 2010 07:45

Date: 05 Sep 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.  Details of the trail can be found here:  http://www.pbb.com.my/node/464

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Ngor Hean temple, 19 Sep 2010, 0720 hours

19 Sep 2010 07:20

Date: 19 Sep 2010

Meeting time: 0720 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding up to Air Itam Dam and then to a temple in the middle of fruit orchard in the vicinity of Air Itam Dam forest reserve.  The trail grade is to be moderate with few slope that could be challenging for some.   Ride duration should in between 1.5 to 2.5 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Bangalow, 26 Sep 2010, 0745 hours

26 Sep 2010 07:45

Date: 26 Sep 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  This not an easy ride.  You are riding up to a peak that is close to Malihome Bungalow on cemented singletrack.  One of the toughest trails to ride in Sungai Ara Farmer Trail system.  But you will be rewarded with the breathtaking view to Balik Pulau and Bayan Baru areas.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Gertak Sanggul, 03 Oct 2010, 0715hours

3 Oct 2010 07:15

Date: 03 Oct 2010

Meeting time: 0715 hours

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Carpet aka Secret Garden, 17 Oct 2010, 0745hours

17 Oct 2010 07:45

Date: 17 Oct 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - 1200 steps or "cheng gee chang", 24 Oct 2010, 0715 hours

24 Oct 2010 07:15

Date: 24 Oct 2010

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple).  The climb could be overwhelmed for some.  Ride duration could take more than 2 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Blue House, 31 Oct 2010, 0745hours

31 Oct 2010 07:45

Date: 31 Oct 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.  Details of the trail can be found here:  http://www.pbb.com.my/node/464

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Ngor Hean temple, 07 Nov 2010, 0720 hours

7 Nov 2010 07:20

Date: 07 Nov 2010

Meeting time: 0720 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding up to Air Itam Dam and then to a temple in the middle of fruit orchard in the vicinity of Air Itam Dam forest reserve.  The trail grade is to be moderate with few slope that could be challenging for some.   Ride duration should in between 1.5 to 2.5 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Bangalow, 21 Nov 2010, 0745 hours

21 Nov 2010 07:45

Date: 21 Nov 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  This not an easy ride.  You are riding up to a peak that is close to Malihome Bungalow on cemented singletrack.  One of the toughest trails to ride in Sungai Ara Farmer Trail system.  But you will be rewarded with the breathtaking view to Balik Pulau and Bayan Baru areas.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Gertak Sanggul, 28 Nov 2010, 0715hours

28 Nov 2010 07:15

Date: 28 Nov 2010

Meeting time: 0715 hours

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Carpet aka Secret Garden, 05 Dec 2010, 0745hours

5 Dec 2010 07:45

Date: 05 Dec 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - 1200 steps or "cheng gee chang", 19 Dec 2010, 0715 hours

19 Dec 2010 07:15

Date: 19 Dec 2010

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple).  The climb could be overwhelmed for some.  Ride duration could take more than 2 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

SGA MTB Ride - Blue House, 26 Dec 2010, 0745hours

26 Dec 2010 07:45

Date: 26 Dec 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.  Details of the trail can be found here:  http://www.pbb.com.my/node/464

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

G Club Meeting 10/3/10 - Sandy Bay Paradise Hotel

10 Mar 2010 21:30

Would like to call for a meeting for the following :-

 

1. G Club Campaign for Safety Ride.

2. Penang Fondo

 

Details of meeting date , time and venue as follows ;

Date : 10/3/10 (Wednesday)

Time : 9pm

Venue : Sandy Bay Paradise Hotel Tg Bungah

 

i would like to invite all those who wish to help out / contribute / give ideas for the above to attend this meeting.

 

Appreciate full attendance by all potential volunteers.

 

See you all on Wednesday.

Captain - Posted on 08 March 2010

G Club MTB Ride - Carpet aka Secret Garden, 07 Mar 2010, 0730hours

7 Mar 2010 07:30
7 Mar 2010 10:45

Date: 07 Mar 2010 (Sunday)

Meeting time: 0730 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Registration deadline for Sungai Lembing MTB Challenge 2010

1 Mar 2010 00:00
2 Mar 2010 00:00

Registration deadline for Sungai Lembing MTB Challenge 2010.  Visit the following link for more details:

Sungai Lembing MTB Challenge 2010

turbosnail - Posted on 20 February 2010

Round Island Ride (Night Ride), 28 February 2010, 8:15pm at Island Plaza

28 Feb 2010 20:15
28 Feb 2010 20:15

Date: 28 February 2010

Meeting time: 2015 hour

Meeting place: Island Plaza

Other Meeting Place: Kah Kean Cycling Shop @ 2130 hour

Contact: Stingray, 017 four four zero nine six eight three or raymondDOTtan@mymethDOTcom

View Trails: Round Island

Route (estimate worst time): Island Plaza (2015)- Green Lane (2045)- Bukit Gambier - Bayan Baru (meet another cycling group : 2130) - Teluk kumbar - Balik Pulau (2230) - Teluk Bahang (2345) - Island Plaza (0030)

 

Ride duration: 3.0 Hours to 4.0 Hours.

Distance: about 72 km

Average Speed: 20km/h

stingray - Posted on 12 February 2010

Karnival MTB Piala Pengarah PTSB, 28 Feb 2010

28 Feb 2010

This is an MTB race. Two categories:

1.  Invitation - limit to 150 participants

2.  Open - limit to 150 participants

There will also be a 35km "Mini Jamboree" kinda ride for beginners.

Fee is RM35 per head.  Goodie bags will be given to participants during the event.  The deadline is 14 February 2010. 

For details, visit http://callbarup.blogspot.com/2010/01/jom-kayuh-ptsb-karnival-mtb-piala.html

turbosnail - Posted on 30 January 2010

Kayuhan Amal Untuk Pengurusan Orang Kurang Upaya, 0730 hours, 28 Feb 2010

28 Feb 2010 07:30
28 Feb 2010 13:00

 

Sketchy details.  But I think this fellowship ride is a roadie event. Ride distance is 80+ km from Bertam, Kepala Batas to Tanjung Dawai.  RM40 per head.  For other info regarding this event, visit http://crossortxc.blogspot.com/2010/01/kayuhan-amal-untuk-pengurusan-orang.html

turbosnail - Posted on 30 January 2010

SGA MTB Ride - Gertak Sanggul, 28 Feb 2010, 0715hours

28 Feb 2010 07:15
28 Feb 2010 11:15

Date: 28 Feb 2010

Meeting time: 0715 hours

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Laksamana Betong Thailand Ride Friday 26-2-2010 0700hours

26 Feb 2010 07:00

Peng from Laksamana cycling club, Prai is organising a 2 days 1 night cycling trip to Betong, Thailand

Five confirmed to ride on Friday morning 7am from Prai, expected home the following day late in the evening.  Anyone keen please sign up or contact Peng hp 012 4339335 penbh@yahoo.com or Raymond 012 4988462

Club's website http://laksamana-cycle-club.blogspot.com/

Starting: Gather at Prai Kulim Highway 1st toll gate 7.00 am

Preparations:

1) Personal effects for 1 night stay in Betong

2) Bicycle lights front and back

3) Helmet

4) Suncream

5) Malaysian Ringgit (no need Thai Bath)

6) Passport

daniel - Posted on 24 February 2010

SGA MTB Ride - Bangalow, 21 Feb 2010, 0745 hours

21 Feb 2010 07:45
21 Feb 2010 10:45

Date: 21 Feb 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  This not an easy ride.  You are riding up to a peak that is close to Malihome Bungalow on cemented singletrack.  One of the toughest trails to ride in Sungai Ara Farmer Trail system.  But you will be rewarded with the breathtaking view to Balik Pulau and Bayan Baru areas.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Seri Iskandar MTB Exploration 2010, 21 Feb 2010

21 Feb 2010 07:30

 

Details:  http://simtbexploration.blogspot.com/

Venue: Seri Iskandar, Perak (N4° 21.501 E100° 58.022)

turbosnail - Posted on 21 November 2009

Round Island Ride (Clock-wise), 20 February 2010, 0630 at Island Plaza

20 Feb 2010 06:30

Date: 20 February 2010

Meeting time: 0630 hours

Meeting place: Island Plaza

Other Meeting place: 0645 at Union High School juntion, 0720 at Vistana Hotel

Contact: Stingray, 017 four four zero nine six eight three or raymondDOTtan@mymethDOTcom

 

Marshall: Susumu & Daniel Lee (both are good in climbing up the hill)

Excursion: Lazy Rider (Balik Pulau Tour Guide) will lead us to a mild offroad trail along the coast to catch a breathtaking scenery before heading to the Famous "Hokkien Mee & Kopi O"...hihi

Mid Sweeper: Nightrider (rides during the night time, have eyes of a hawk)

Final Sweeper: Stingray & Aubun (both love to chit chat)

Blogger: Posh66 (talented writer & fast on flat road)

 

stingray - Posted on 14 February 2010

Deadline for Karnival MTB Piala Pengarah PTSB

14 Feb 2010

For details of the race, visit http://www.pbb.com.my/node/746

turbosnail - Posted on 30 January 2010

Round Island Ride, 13 February 2010, 0630 at Island Plaza

13 Feb 2010 21:20

Date: 13 February 2010

Meeting time: 0630 hours

Meeting place: Island Plaza

Contact: Stingray, 017 four four zero nine six eight three or raymondDOTtan@mymethDOTcom

 

Marshall: Susumu & Daniel Lee (both are good in climbing up the hill)

Excursion: Lazy Rider (Balik Pulau Tour Guide) will lead us to a mild offroad trail along the coastal line to catch the breath taking scenary before heading to the Famous "Home made Kopi & Kuih Kar pek"...hihi

Mid Sweeper: Nightrider (ride during the night time, got the eyes of hawk)

Final Sweeper: Stingray & Aubun (both love to chit chat)

Blogger: Posh66 (talented writer & fast in flat road)

 

stingray - Posted on 09 February 2010

CNY eve Off Road Ride - 13/2/10

13 Feb 2010 07:30

Due to request, we will heading over to Gertak Sanggul for our "siew kang" ride before we say goodbye to the year of Ox. Details of the ride as follows :-

Date : 13/2/10 (CNY ever)

Time : 7.30am

Where to meet : Gertak Sanggul roundabout (N5°16.882' E100° 11.406').  You can also refer to the following Google Map for the location of the meeting point: http://Gertak Sanggul Roundabout

Captain - Posted on 08 February 2010

Free Bicycle Workshops - Maintenance and Emergency Repairs , 7th Feb 2010 @ New World Park, 8:00am to 10:00am

7 Feb 2010 08:00

Date: 7th February 2010

Meeting Time: 8:00am to 10 am

Duration: 2 hours

Meeting Place: New World Park

Language use ;Malay, English and Hokkien (Campur campur lah)

Contact: Stingray, Mobile: Zero One Seven Four Four Zero Nine Six Eight Three

Email: raymondDOTtan@mymethDOTcom

stingray - Posted on 15 January 2010

SGA MTB Ride - Ngor Hean temple, 07 Feb 2010, 0720 hours

7 Feb 2010 07:20
7 Feb 2010 10:20

Date: 07 Feb 2010

Meeting time: 0720 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding up to Air Itam Dam and then to a temple in the middle of fruit orchard in the vicinity of Air Itam Dam forest reserve.  The trail grade is to be moderate with few slope that could be challenging for some.   Ride duration should in between 1.5 to 2.5 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

CANCELLED!!! G Club Tlk Bahang Ride on 7.2.2010 - CANCELLED

2 Feb 2010 14:51
8 Feb 2010 14:51

Pls take note that due to the Bicycle Workshops on the 7/2/2010, the Tlk Bahang Ride will be CANCELLED.

Pls do not wait at G hotel. Instead you are welcome to attend the workshops at New Word Park at 8 am on 7.2.2010

look368 - Posted on 02 February 2010

Mt Eskine , 31 Jan, 1600hrs , off road ride

31 Jan 2010 16:00

I will be going on my regular Mt Bike adventure up Mt Eskine this coming Sunday afternoon. Those who are interested, please refer to the below details 

 

Date: 31/Jan 2010

Time: 1600hrs

Meeting Point: The car park behind Mt Eskine market. 

Contact no: 012-48 two two nine seven two 

Email: kntheng@gmail.com

 

Description

We will take a slow ride up the trail to Point 23. Distance is about 3-4km. We should be back down in 90 mins. 

KNTXX - Posted on 29 January 2010

SGA MTB Ride - Blue House, 31 Jan 2010, 0745hours

31 Jan 2010 07:45
31 Jan 2010 10:45

Date: 31 Jan 2010

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.  Details of the trail can be found here:  http://www.pbb.com.my/node/464

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

Round Island Ride, 30 January 2010, 0600 at Island Plaza

30 Jan 2010 06:00

Date: 30 January 2010

Meeting time: 0600 hours

Meeting place: Island Plaza

2nd Meeting Place: Union Secondary School @ 6:15am

Contact: Stingray, 017 four four zero nine six eight three or raymondDOTtan@mymethDOTcom

 

Marshall: Susumu & Daniel Lee (both are good in climbing up the hill)

Excursion: Lazy Rider (Balik Pulau Tour Guide) will lead us to a mild offroad trail along the coastal line to catch the breath taking scenary before heading to the Famous "Hokkian Mee & Kopi O"

Mid Sweeper: Nightrider (ride during the night time, got the eyes of hawk)

Final Sweeper: Stingray & Aubun (both love to chit chat)

Blogger: Posh66 (talented writer & fast in flat road)

 

stingray - Posted on 23 January 2010

SGA MTB Ride - 1200 steps or "cheng gee chang", 24 Jan 2010, 0715 hours

24 Jan 2010 07:15

Date: 24 Jan 2010

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom Description:

Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple). The climb could be overwhelmed for some. Ride duration could take more than 2 hours.

Note: Please take note that ride plan may change due to weather or other cycling events. Do contact the ride master to confirm before the date.

turbosnail - Posted on 21 January 2010

3rd Saturday Night Ride at Youth Park, 8pm, 23 January 2010

23 Jan 2010 19:45

PAC (Penang Adventurer Club) is taking the lead of 3rd Saturday Night Ride.
For January, it will fall on 23rd Jan
Time: 8.00pm (do come 15mins in advance)
Starting Point: Canteen of Youth Park
Route: Youth Park to Botanical Garden
Please ensure you have suffiecient lighting!

This is easy road ride. Children are acceptable

No Helmet, No Ride!

turbosnail - Posted on 15 January 2010

Round Island Ride, 23 January 2010, 0615 at Union Secondary School

23 Jan 2010 06:15

Date: 23 January 2010

Meeting time: 0615 hours

Meeting place: Union Secondary School

Contact: Stingray, 017 four four zero nine six eight three or raymondDOTtan@mymethDOTcom

 

Description: Normally on every saturday morning, I will ride solo for round island ride. If you want to join me you are welcome but please take some light breakfast before the ride. The will be only one stop at Balik Pulau for drinks and breakfast.

 

Route: Green Lane - Union Secondary School- Tanjung Tokong - Batu Ferringhi - Teluk Bahang - Balik Pulau - Teluk Kumbar - Sungai Ara - Green Lane.

 

Ride duration: 3 hours to 3.5 Hours.

Distance: 72 km

Average Speed: 20km/h

NO HELMET NO RIDE

stingray - Posted on 20 January 2010

G Club 1st off road NIGHT RIDE !! 22/1/10

22 Jan 2010 19:31

This is it !! after giving much thought together with Turbosnail and consulting other members, the above ride is now confirmed.

Details of the ride are as follows :-

Date : 22/1/10

Time : 7.15pm

Meeting place : Genting Restaurant, Island Glades (N5° 22.979, E100° 18.231)

Trail to tackle : Bukit Gambier

As this is the 1st time we are trying out the trail at night, we would like to set some conditions before you could join us.

1. you need to have at least 2 LED headlights

2. you need to have a rear red light as well

3. you need to have your mobile phone with you

4. you must at least gone to 2 to 3 off road ride before this ride (meaning you should know what to expect in terms of riding conditions)

Captain - Posted on 17 January 2010

Green-Gold Ride 17/01/10, 7am at SMJK Telok Air Tawar

17 Jan 2010 07:00
Dear Fellow MTB riders,
 
Goog afternoon !

stingray - Posted on 13 January 2010

Laksamana Ride on 17/1/10

11 Jan 2010 20:55
Dear G-Club members,
 
Goog afternoon !

look368 - Posted on 11 January 2010

9th G Club Bahang Ride - Sunday 10thJan 2010

10 Jan 2010 07:30

Easy-Moderate G Club Bahang Ride is here again. This will be the 1st ride for year 2010. Bring your friends along. Details of the ride are as follows :-

Date : 10th Jan 2010

Time : 7.30am sharp !!

Meeting Place : G Hotel, Gurney Drive Main Entrance

Like the last Bahang ride, we will re-group apposite Rasa Sayang Hotel before proceeding to T Bahang kopitiam for breakfast. Then to proceed up to T Bahang Da.

Some will proceed to P. Betong / Balik Pulau / Round Island from dam. Others will head back to G Hotel via RELA escort.

If possible, please sign up.

Captain - Posted on 02 January 2010

Post Malakoff Recovery and Newbie Road Ride, 03 January 2010, 0745hours

3 Jan 2010 07:45

Date: 03 Jan 2010

Meeting time: 0745 hours

Meeting place: McDonald's Sunrise Tower, Gurney Drive (N5° 26.397 E100° 18.492)

Contact: Turbo Snail, (012) 423-One Seven Two Five or turbosnailATimap-mailDOTcom

turbosnail - Posted on 27 December 2009

SGA MTB Ride - Gertak Sanggul, 03 Jan 2010, 0715hours

3 Jan 2010 07:15
3 Jan 2010 10:30

Date: 03 Jan 2010

Meeting time: 0715 hours @ Roti Bakar Place or 0750 hours @ Gertak Sanggul Fishing Village

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583), Gertal Sanggul Fishing Village (Gertak Sanggul fishing village(N5° 16.885 E100° 11.402).

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOT

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 07 November 2009

Round Island Ride, 02 January 2010, 0615 at Union Secondary School

2 Jan 2010 06:15

Date: 02 Jan 2010

Meeting time: 0615 hours

Meeting place: Union Secondary School

Contact: Stingray, 017 four four zero 9683 or raymondDOTtan@mymethDOTcom

Description:  Normally on every saturday morning, I will ride solo for round island ride. If you want to join me you are welcome but please take some light breakfast before the ride because there will be only one stop at teluk bahang for drinks & breakfast.

Route: - Union Secondary School - Green Lane - Airport - Teluk Kumbar - Balik Pulau - Teluk Bahang - Island Plaza - Bagan Jermal - Union Secondary School - Green Lane.

Ride duration: 3 hours to 3.5 Hours.

Distance: 72 km

Average Speed: 20km/h

NO HELMET NO RIDE

stingray - Posted on 01 January 2010

Malakoff Interstate Fellowship Ride, 31 December 2009 and 01 January 2010

31 Dec 2009 07:00
1 Jan 2010 19:30

First interstate road ride hosted by Penangites!  For details of the ride visit the following url:

http://www.kotrt.com.my/fellowship_main.html

turbosnail - Posted on 30 October 2009

Penang to Singapore Ride - Cycle for the Deaf (Rotary Club Meeting - 29th. December, 2009)

27 Dec 2009 14:00
29 Dec 2009 21:05

Event                :    Briefing on Penang to Singapore Ride (Riders Wusolow and Daniel Shee)

Place                :     Sandy Bay Paradise Hotel (Rotary Club Tg Bungah meeting room)

Time                :      9.00 pm, 29th December, 2009

What is it about  :    Please refer recent forum with the above topic

look368 - Posted on 27 December 2009

Monsoon Ride 2009

27 Dec 2009 08:00
Monsoon Ride 09 is a perfect opportunity for sport adventure enthusiasts to head on down to the treasured eco sport tourism spot to participate in this year’s adventure ride.
The plan is to give lots of adventures and fun rides by traversing the routes that will take you through some of the most scenic and breathtaking sights that you will never forget.


turbosnail - Posted on 07 November 2009

SGA MTB Ride - Carpet, 27 Dec 2009, 0745hours

27 Dec 2009 07:45
27 Dec 2009 11:00

Date: 27 Dec 2009

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 07 November 2009

KAYUHAN WARISAN TAIPING 2009, 0730 hours, 27 Dec 2009

27 Dec 2009 07:30

Date: 27 Dec 2009
Meeting time: 0730 hours
Meeting place: Kompleks Rakan Muda, Kamunting (N4° 53.824 E100° 44.155)
Contact: PN. SURYANI : 019 – 478 one three seven zero, EN. SHAIFUL : 019 – 511 eight zero eight eight, EN. SHAFIZ : 019 – 644 six seven zero eight
Description:  This is an MTB event.  Ride distance to be 45km.  Registration fee is RM50.00.  Limited to 500 participants only.  For details,  http://kayuhanwarisantaiping2009.blogspot.com/

Trail map:
KWTP Trail Map

turbosnail - Posted on 18 November 2009

Goodies collection for Kayuhan Warisan Taiping 2009

26 Dec 2009 12:00
26 Dec 2009 23:59

Date: 26 Dec 2009

Time: 1200 - 2400 hours

Meeting place: Kompleks Rakan Muda, Kamunting (N4° 53.824 E100° 44.155)
Contact: PN. SURYANI : 019 – 478 one three seven zero, EN. SHAIFUL : 019 – 511 eight zero eight eight, EN. SHAFIZ : 019 – 644 six seven zero eight
Description: Goodies and reg plate collection for Taiping Heritage Ride participants.

 

turbosnail - Posted on 18 November 2009

G-Club MTB Ride - Penang Hill Mid Station, 25 Dec 2009, 0800hours

25 Dec 2009 08:00
25 Dec 2009 12:00

Date: 25 Dec 2009

Meeting time: 0800 hours

Meeting place: Penang Hill Railway station (N5° 24.499 E100° 16.623)

Contact: Turbo Snail, (012) 423-One Seven Two Five or turbosnailATimap-mailDOTcom

turbosnail - Posted on 24 December 2009

SGA MTB Ride - Gertak Sanggul, 20 Dec 2009, 0715hours

20 Dec 2009 07:15
20 Dec 2009 10:30

Date: 20 Dec 2009

Meeting time: 0715 hours

Meeting place: Sungai Tiram Roti Bakar(Joo Leong Cafe) (N5° 18.134 E100° 16.583)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOT

Description:  MTB ride on singletrack, which I think is the most scenic trail in Penang.  Trail gradient to be easy to intermediate.  This is a true mountain bike offroad ride.  Ride duration is about 1 to 1.5hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 07 November 2009

Penang International DH Race, 20 December 2009

20 Dec 2009 07:00

Downhill freaks, speed demons, this is your game!

 

 

For more details, visit http://www.mygravityriders.com/forum/viewtopic.php?f=3&t=3583

turbosnail - Posted on 21 November 2009

LAUNCHING OF BICYCLE EMBLEMS AND SIGNAGES

14 Dec 2009 22:21
27 Dec 2009 14:08

1st TRAIL   -   GURNEY DRIVE TO TLK BAHANG 

DATE  ;   20th, December, 2009

TIME  ;   830 am

PLACE;   G hotel, Salon (to be confirmed)  -  Breakfast provided courtesy from G hotel. After press conference  at G hotel adjourn to Gurney Roundabout for unveiling of first bicycle signage.

ATTIRE;  G club official t shirt    or    Campaign for a lane t shirt  (  Those who wants to ride please let us know so that we could arrange for security guard to take care of your bike while you attend the conference a G hotel

2nd TRAIL   -   HERITAGE ENCLAVES

look368 - Posted on 14 December 2009

SGA MTB Ride - Bangalow, 13 Dec 2009, 0745 hours

13 Dec 2009 07:45
13 Dec 2009 11:45

Date: 13 Dec 2009

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  This not an easy ride.  You are riding up to a peak that is close to Malihome Bungalow on cemented singletrack.  One of the toughest trails to ride in Sungai Ara Farmer Trail system.  But you will be rewarded with the breathtaking view to Balik Pulau and Bayan Baru areas.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 07 November 2009

G Club Bahang Ride - 13/12/09

13 Dec 2009 07:30

The monthly G Club Bahang Ride is here again. Details as follows :-

Date : 13/12/09

Time : 7.30am

Where to meet : Main entrance of G Hotel, Gurney Drive

This trip, we might do a shorter stop at T. Bahang kopitiam then proceed to TFF and turn back.

Bring your friends.

Captain - Posted on 01 December 2009

Air Itam 1200 steps MTB Ride, 12 Dec 2009 0730 hrs

12 Dec 2009 07:30
12 Dec 2009 08:07

 

Date : 12/12/09

Time : 7.30am

Where to meet : Foothill of Air Itam Dam

msteh - Posted on 11 December 2009

Lembah Bujang via Pantai Merdeka Road Trip 6 Dec 2009

6 Dec 2009

Date: 6th December 2009

Meeting time: 6.30am SHARP

Meeting place: Penang Jetty

Ride duration: 3 hours one way.

Description: We will be riding from B'w to Pantai Merdeka where we take a boat across the Merbok River to Tg Dawai. We then proceed to Merbok for an early lunch. Then to Archaeology Museum.

Bring a change of clothes if you like to take a dip in the rock pools.

Trails mostly flat. If you like riding, exploring and a bit of history, you'll definitely enjoy this.

Please be punctual. Last boat trip from Tg Dawai to Pantai Merdeka is tentatively at 5.00pm. If we miss this boat we will have to go home via Sg Petani.

Email me at wusolowATgmailDOTcom to confirm participation.

wusolow - Posted on 30 November 2009

Sunday Super Crit 2009

6 Dec 2009 09:00
6 Dec 2009 16:00

This is a race that will be in Putrajaya.  Open to racers and mountain bikers.  For details, please visit http://www.theraceboy.com/

 

 

 

 

turbosnail - Posted on 21 November 2009

SGA MTB Ride - Carpet, 06 Dec 2009, 0745hours

6 Dec 2009 07:45
6 Dec 2009 10:30

Date: 06 Dec 2009

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 07 November 2009

KOTRT Kayuh Lasak - I'M BACK, 05 - 06 December 2009

5 Dec 2009 06:30
6 Dec 2009 22:30

Registration is full.  Please treat this as a schedule reminder for those who take part.  For details visit http://www.kotrt.com.my/kayuh_lasak_overview.html

turbosnail - Posted on 31 October 2009

Round Island Ride - Island Plaza, 05 Dec 2009, 0600 hours

5 Dec 2009 06:00

Date: 05 Dec 2009

Meeting time: 0600 hours

Meeting place: Island Plaza

Contact: Stingray, 017 four four zero 9683 or raymondDOTtan@mymethDOTcom

Description:  Normally on every saturday morning, I will ride solo for round island ride. If you want to join me you are welcome but please take some light breakfast before the ride. I would prefer NON STOP for breakfast because my Saturday VISA will expired at 0930.

Route: Island Plaza - Bagan Jermal - Green Lane - Airport - Teluk Kumbar - Balik Pulau - Teluk Bahang - Island Plaza.

Ride duration: 3 hours to 3.5 Hours.

Distance: 62 km

Average Speed: 20km/h

NO HELMET NO RIDE

stingray - Posted on 02 December 2009

Tlk Bahang Ride 13th December 7.30am

2 Dec 2009 09:47

Our usual 2nd Sunday Tlk Bahang ride will fall on the 13th, December. We will meet at G hotel at 7.30 am. Hope everybody can make it. WE will hv the usual breakfast break at Tlk Bahang and those who wants to go back, the RELA will accompany back but those who wants to proceed to Balik Pulau can proceed

look368 - Posted on 02 December 2009

Tropical Fruit Farm 29 Nov 09, Afternoon Ride 2pm

29 Nov 2009 14:00

Short ride up Tropical Fruit Farm. 

Start Venue :  Esso Tg. Bunga (Opposite nasi Kandar shop)

Time :  2:00pm

Short Break at mamak shop in Teluk Bahang and stop at peak of Tropical Fruit Farm.

Advice for those who want to join :  Put on Sunscreen to avoid being roasted.

**No Helmet, No Ride**

Contact :  Nightrider 012-418 9663

 

nightrider - Posted on 28 November 2009

SGA MTB Ride - Carpet, 29 Nov 2009, 0745 hours

29 Nov 2009 07:45

Date: 29 Nov 2009

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

 

Note: Please take note that ride plan may change due to weather or other cycling events.  Do contact the ride master to confirm before the date.

turbosnail - Posted on 28 October 2009

Round Island 29 Nov 09, 7.00am Esso station TBungah ->gurney drive -> coastal road..

29 Nov 2009 07:00

Chairman Dr Lim and Chia will be retracing the 'Ride with CM' round island starting off Esso station Tanjung Bungah 7.00am.  All are welcome to join the ride, the more the merrier !

ps:  Dr and his gang from tanjung bungah will be riding pass gurney drive around 7.15am and then down the coastal road to Queensbay and on to Batu Maung.  You are welcome to join us at any point along this stretch... 

For Dr Lim,

Daniel Shee 

daniel - Posted on 28 November 2009

Ferry Terminal to Kuala Muda Ride on 27th Nov 2009, 0620 at Island Plaza, 0650 at Ferry Terminal

27 Nov 2009 06:50

Dear fellow riders,

I'm putting this event on behalf of Wusolow. Wusolow is organising a leisure ride to Kota Kuala Muda, Kedah this coming Friday (27th Nov.'09). This ride takes you across to Butterworth where our journey begins. We ride up north to Teluk Air Air Tawar. From here we head for Kota Kuala Muda riding through scenic paddy fields and rustic villages along the way.

If you like to join us, meet in front of Island Plaza at 6.20am, Gurney Drive at 6.30am or the Penang Ferry Terminus at 6.50am.

Estimate time to come back: Noon to reach Ferry Terminal

Contacts: Stingray    Email: raymondDOTtan@mymethDOTcom   Tel: 017-Four Four Zero 9683

Current rider list:

- Wusolow, Nigthrider, Stingray, Fudge, Susumu

stingray - Posted on 26 November 2009

SGA MTB Ride - Ngor Hean Temple, 22 Nov 2009, 0745hours

22 Nov 2009 07:45

Date: 22 Nov 2009

Meeting time: 0745 hours

Meeting place: Coffeeshop opposites to 7/11 (approx. N5° 24.110 E100° 16.605)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or mtmckayATstreamyxDOTcom

Description:  You will be riding up to Air Itam Dam and then to a temple in the middle of fruit orchard in the vicinity of Air Itam Dam forest reserve.  The trail grade is to be moderate with few slope that could be challenging for some.   Ride duration should in between 1.5 to 2.5 hours.

turbosnail - Posted on 28 October 2009

Pendang MTB Jamboree 2009, Bukit Perak, Kedah, 0730 hours, 21 Nov 2009

21 Nov 2009 07:30

Date: 21 Nov 2009

Meeting time: 0730 hours

Meeting place: Bukit Perak, Pendang, Kedah (approx N5° 56.879 E100° 37.087)

Contact: Pendang MTB, (04) 759 - six zero seven seven, (04) 759 - five eight zero three

Description:  Visit http://pendangmtb.blogspot.com for details

turbosnail - Posted on 31 October 2009

Jln Waterfall Jeeptrack to 168, 21 Nov 2009, 0700hours

21 Nov 2009 07:00

Date: 21 Nov 2009

Meeting time: 0700 hours

Meeting place: De Juice-Big Ben's Breakfast (N5° 26.101 E100° 17.684)

Contact: Richard Khor, rikhorcsATgmailDOTcom,

Description:  You will be riding up to 168 Cafe of Penang Hill via the Jln Waterfall jeeptrack.  After a regroup at 168 Cafe and carbo loading, they will be going down via offroad singletrack.   Please take note that this is a physically demanding ride and also require riders that understand their bikes and themselves well.  Newbies are NOT encouraged to join this ride.  Ride duration should be in between 1.5 to 3.0 hours depending how fit the riders are.

turbosnail - Posted on 20 November 2009

SGA MTB Ride - Blue House in Sungai Ara Farmer trail, 15th Nov 2009, 0745 hours

15 Nov 2009 07:45

Date: 15 Nov 2009

Meeting time: 0745 hours

Meeting place: Yoyo Cafe (N5° 19.204 E100° 16.164)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or michael.mark.kayx.thamATintelDOTcom

Description:  MTB ride on singletrack up to a house painted in blue(hence the name Blue House).  Trail gradient to be intermediate to tough.  This is a true mountain bike offroad ride.

turbosnail - Posted on 28 October 2009

Kayuhan Klasik, Kulim, Kedah, 0730 hours, 15 Nov 2009

15 Nov 2009 07:30

Date : 15 Nov 2009
Time 7.30am

Venue : Jabatan Perhutanan, Jalan Kelang Lama, Kedah (call organizer for details since the venue mentioned is at different location on map)

Route : Kulim- Bukit Hijau -Kulim 84km actual distance

Entry Fees : RM 30 (Steel is real T-shirt will be included)
Vintage and Retro Road bikes, road and MTB are welcome

Registration closed on 15 Nov or reaching 200 participant which ever comes first
Forms are available at several bikes shops:
Penang: CCI and Dreamwerks
Seberang : KT and Pinkbike
Kulim : Beskal, Tmn Selasih
Contact the following for more information

turbosnail - Posted on 11 November 2009

G-Club MTB ride, Bukit Gambier, 0715 hours, 15 Nov 2009

15 Nov 2009 07:15

Date: 15 Nov 2009

Meeting time: 0715 hours

Meeting place: Genting Cafe, Lorong Delima 6 (N5° 22.979, E100° 18.231)

Contact: Turbosnail, (012) 423-One Seven Two Five or turbosnailATimap-mailDOTcom

turbosnail - Posted on 11 November 2009

Plentong Epic Ride 2009, Johor Bahru, 0700hours, 15th Nov 2009

15 Nov 2009 07:00
15 Nov 2009 16:00

Date: 15 Nov 2009

Time: 0700 - 1600 hours

Meeting place: Plentong, Johor Bahru (N1° 31.260 E103° 49.491)

Contact: Cyclemotion,  (012) 711 - one zero nine one or (012) 752 - one zero seven seven

Description:  55km of verious terrains in Plentong, Johor Bahru.  Entry fee is RM25 per head.  For more details visit http://www.cyclemotion2000.com

turbosnail - Posted on 31 October 2009

GPS (Gopeng Peanut Search), 0700 hours, 13 - 15 Nov 2009

13 Nov 2009 14:00
15 Nov 2009 17:00

Date: 13 - 15 Nov 2009

Meeting time: 0700 hours

Meeting place:  Earth Camp @ Kg Cholek, Gopeng, Perak (N04° 25’50.0” E101° 10’51.9”)

Contact: Nomad Adventure, event@nomadadventure.com

Description:  GPS promises to be a fun & exciting event for mountain bikers & outdoor enthusiasts. It is not a race in the traditional sense, rather a navigational challenge done on mountain bikes. However top finishers will get bragging rights and special token of achievement.

GPS is designed to:

    * provide safe, fun & exciting event for the growing mountain bike community
    * introduce participants to the local & hidden gems around Gopeng

turbosnail - Posted on 31 October 2009

G Club Teluk Bahang Ride - 8/11/09

8 Nov 2009 07:30

G Club monthly Teluk Bahang ride is here again.

Details as follows :-

Date : 8/11/2009 (2nd Sunday of the month )

Time : 7.30am sharp

Meeting place : G Hotel, Gurney Drive main entrance.

As usual, we stop at Teluk Bahang kopitiam for breakfast.

Captain - Posted on 30 October 2009

SGA MTB Ride - 1200 steps or "cheng gee chang", 08 Nov 2009, 0715 hours

8 Nov 2009 07:15

Date: 08 Nov 2009

Meeting time: 0715 hours

Meeting place: Kheng Hai Tong Cafe (N5° 24.076 E100° 16.535)

Contact: Michael Tham, (019) 410-Seven One Eight Nine or michael.mark.kayx.thamATintelDOTcom

Description:  Tough climb on car accessible pavement up to the Temple of Clear View (1200 steps temple).  The climb could be overwhelmed fosome.  Ride duration could take more than 2 hours.

turbosnail - Posted on 28 October 2009

MTB ride with Sungai Ara SGA group, 01 Nov 2009, 0745 hours

1 Nov 2009 07:45

I will not be able to join since I have other family commitments.

For those who are interested, please refer to below for details:

Venue:  Sungai Ara Farmer Trail

Date: 01 Nov 2009

Time: 0745 hours

Meeting place: Yoyo Cafe (N5°19'11.65" E100°16'10.33"), Jln Kenari, Sungai Ara

Contact:  Michael Tham (019) 410-seven one eight nine

Description:  You will be riding on car accessible farmer trail that will lead you to a well manicured lawn yard that we call carpet or secret garden.  Gradient of the trail is to be easy to moderate.   Ride duration should in between 2 to 3 hours.

turbosnail - Posted on 28 October 2009

Malakoff Interstate Fellowship Ride (road ride) mainland route trial ride, 01 Nov 2009, 0730 hours

1 Nov 2009 07:30

Date: 01 Nov 2009

Meeting time: 0730 hours

Meeting place: Auto City (N05º20.249’ E100º25.696’)

Contact: Chen, 012 486- Six Nine Three Two
Description:  A trial ride on maindland route.  Distance to be in the range of 145~150km. Marshals will escort the ride. If you need support cars, please make your own arrangement. Come join us and have great fun.  Please take note that this is a road ride.  KOTRTs also implement no helmet no ride policy.

For more info about Malakoff Interstate Fellowship Ride, visit http://www.kotrt.com.my/fellowship_main.html

turbosnail - Posted on 30 October 2009

"RIDE WITH CM" FULFILLED !

25 Oct 2009

Ride with CM

Participants at the start of the Round Island Ride 7am this morning !

Note: More exciting pictures from the camera men will be uploaded onto this page and to the gallery soon.  Those riding Teluk Bahang and Family ride, your pictures will be shown here or in the gallery shortly. 

root - Posted on 15 August 2009

Bkt Jambul - Bayan Lepas - B. Pulau road ride by Richard Lee, 17 Oct 2009, 0730 hours

17 Oct 2009 07:30
17 Oct 2009 12:30

Route: bukit jambu - bayan Lepas - b.pulau and back
Meet: Vistana Hotel, Yeap Chor Ee road.
Time:  7.30am
Contact: Richard Lee, H/P no: 012-4547129

turbosnail - Posted on 16 October 2009

Deepavali Ride - P Tikus- Tlk Bahang - P Betong and back - 17 Oct 2009 0730 hours

17 Oct 2009 07:30
17 Oct 2009 12:00

I am thinking of doing the road ride again this coming Saturday to Pulau Betung.  The route is as follow:

Gurney drive - Tanjung Bungah - Batu Ferringhi - Teluk Bahang - Sungai Rusa -  Pulau Betung and back. 

Distance is around 85km round trip.  

I will stop at the following regroup points:

Teluk Bahang Kopitiam

At the peak of the climb after Tropica Fruit Farm.

Junction at Jln Sg Rusa before turning to Pulau Betong

Pulau Betong Kopitiam

I will start my ride at around 7.30am from Pulau Tikus.

turbosnail - Posted on 13 October 2009

Air Itam Dam Ride - 17/10/09

17 Oct 2009 07:00

Another ride for those who wants to climb. Deatils as follows :-

Meeting Point : Foothaill of Air Itam Dam

Time : 0700 hrs

Will ride all the way up to Hilton then decide to go up further or return back.

As usual, bring lots of water and NO HELMET, NO RIDE.

 

Captain - Posted on 16 October 2009

G Club Bahang Ride - 11/10/09

11 Oct 2009 07:30

The monthly G Club Bahang Ride is here again.

This month we will "extend" the ride all the way round Penang Island as practice ride for those who needs a feel of what to expect come 25/10/09. (but you will be riding clockwise during the RIDE WITH CM event)

Turbosnail and other G Club members will be leading the way with the usual brief stop at Teluk Bahang kopitiam. Other stop(s) will be decided during the journey.

Details of the ride are as follow :-

Date / Time : 11th October 2009 / 0730am

Where to meet : G Hotel main entrance

 **Don't be late **

Captain - Posted on 04 October 2009

Batu Gantong Trail - 4/10/09 (8am)

4 Oct 2009 08:00

Batu Gantong Trail ride.

Date : 4th October 2009

Time : 0800 hrs

Where to meet : Entrance to Hokkien Cemetary (Coordinates: N5°24.786 E100°17.675)

Turbosnail will guide us this Sunday.

Notes: 

1.  No helmet no ride!

2.  Cemented singletrack up to a hill station 45.  Trail can be very slippery if rain a day before. 

3.  Be self sufficient.  Anything can happen in the middle of jungle. 

Captain - Posted on 01 October 2009

Press Conference (24/9/09) - Come Ride with CM

24 Sep 2009 11:22

Press conference will be held at following :-

Date / Time : 24th Sept 2009 / 1pm

Venuw : G Hotel / Salon I (Level 2)

All are welcome. The Press Conference is to highlight our CAMPAIGN FOR A LANE event and to update the public on the progress of our event.

Snacks and light refreshments will be served.

Captain - Posted on 03 September 2009

Pantai Aceh Ride - 22/9/09

22 Sep 2009 07:30

Pantai Aceh Ride. Details as follows :-

Date : 22/9/09 (Tuesday)

Time : 0730am

Where to meet : Hillside Esso Petrol Station

Brief stop at T. Bahang Kopitiam / Pantai Aceh.

 

Captain - Posted on 21 September 2009

Mt Erskine Trail - 19/9/09 (replacement ride)

19 Sep 2009 08:00

The above ride is replacement for the Batu Gantong trail which we had cancelled due to safety concern. (slipperly cement path)

Details as follows :-

date : 19/9/09

time : 8.00am

venue : Mt Erskine Market

Captain

Captain - Posted on 18 September 2009

Batu Gantong Trail - 19/9/09 (8am) CANCELL !!

19 Sep 2009 08:00

Date : 19/9/09 (Saturday)

Time : 8.00am

Venue : Batu Gantung, Entrance to Hokkien Cemetary (Coordinates: N5°24.786 E100°17.675)

Turbosnail will be leading all the way up and down.

Captain - Posted on 14 September 2009

G club Penang Cyclists meeting, 9 pm, 15/9/09, Sandy Bay Paradise

14 Sep 2009 22:57
15 Sep 2009 22:57

All who want to contribute ideas to make our campaign for a lane event more successful are welcome.

look368 - Posted on 14 September 2009

MEETINGS; CIMB, G CLUB, ROTARY AND YB CHOW 11 am, 15/9/09 KOMTAR

14 Sep 2009 22:54
15 Sep 2009 13:54

A detail and hopefully fruitful discussion will come out of this meeting. Hopefully something will happen for the betterment of the cycling fraternity in Penang after this meeting.

look368 - Posted on 14 September 2009

G Club Monthly Bahang Ride - 13/9/09

13 Sep 2009 07:30

The monthly G Club T. Bahang ride is here again. Details as follows :-

Venue : G Hotel Entrance

Time : 0730am

Brief stop at Teluk Bahang kopitiam and if you are game, proceed to Tropical Fruit Farm for juices.

The ride back down from TFF to T. Bahang will be worth it !!

Captain - Posted on 07 September 2009

Mt Erskine Trail Ride - 12/9/09

12 Sep 2009 16:30

will be meeting up for an off road ride on above date. datials as follows :-

Date : 12-9-09

Time : 4.30pm

Where to meet : Mt Erskine Market

It will be a slow ride around the trail as G Club Bahang ride will take place the following morning. (see event board for details)

See ya.

Captain - Posted on 10 September 2009

Tentative date 15th. Sept, 11 am; KOMTAR; Meeting with YB Chow Kon Yeow

8 Sep 2009 11:00

A  tentative meeting with be held to facilitate the drawing of the APPROVED bicycle lane (emblem first) on the pilot route i.e from Gurney Drive to Tlk Bahang and the Heritage enclave. Funding for the project will be discussed. You guys got RM 34 K to spare, if yes we can draw the bike lane tomorrow!!!!

look368 - Posted on 27 August 2009

7th, Sept, 4 pm, Sandy Bay Paradise; Meeting with main sponsor CIMB Foundation

7 Sep 2009 16:00

Monday, 7th, Sept 4pm; There will be a meeting with the CIMB Foundation Officers who have tentatively agreed not only to co sponsor our event but also providing fund for bicycling related programmes throughout the whole of next year.

They are on a surveilance trip to make sure the events are beneficial to the community esp the bicycle lane.

 

look368 - Posted on 27 August 2009

5th Sept, 3 pm, Girl Guide HQ;BRIEFING TO THE ST JOHNS AND GIRL GUIDES.

5 Sep 2009 15:00

Saturday, 5th Sept, 3 pm, we have an appointment with the Girl Guide Chief State Commissioner of Puan Chan Kit Sin to brief the Guides on their function during the event which will mainly be in the water stations, assisting the first aiders from St John Ambulance and the starting area.

uPDATE 4/9/09.

Have spoken to Dr Yee Thiam Sun, the St John State commander, and he will be sending a representative to the girl guide HQ on Saturday for the briefing as well

look368 - Posted on 27 August 2009

1st SEPT, 3PM, 53rd FL, KOMTAR; BRIEFING TO THE STATE EXCOS, MPPP, RELA, TRAFFIC POLICE AND JKR

1 Sep 2009 15:00

Tuesday, 1st Sept 3 pm, Bilik Nilam will be the venue for a meeting with the government agencies. As I hv stressed the safety of riders are paramount. We will try to convince the traffic police agency to supply us with as many as officers as possible. Albeit that, as a contingency plan, we will also be employing at least 80 RELA personnels to ensure the safety and smooth running of the event. I have spoken to the RELA officer to provide that many personnels and he has no problem with it (provided you have the $, each RELA costs Rm 25).

We will also have to arrange with the MPPP for a sweeper truck to "sapu" all those stragglers who "prefer to push their bike" when the time limits is up.

look368 - Posted on 27 August 2009

G CLUB MEETING 1/9/09, 9 PM, SANDY BAY PARADISE

31 Aug 2009 21:47
1 Sep 2009 21:47

Agenda ; Discussion on the outcome of the joint meeting. Finalising Riding Jersey and T shirt. RELA personnels, First aiders, ambulance etc.

All are welcome to contribute ideas.

look368 - Posted on 31 August 2009

Pantai Aceh/Sungai Pinang eco ride Sunday 30 Aug

30 Aug 2009 07:30

Turbosnail will lead us to Pantai Aceh/Sungai Pinang this coming Sunday 30 Aug 2009.  Meet at EON Bank Burma Rd (opposite Belisa Row) 7.30am or join us as we wind our way along Tanjung Bungah/Tokong to Teluk Bahang...  

Laksa at Sungai Pinang anyone?

 

daniel - Posted on 29 August 2009

10TH COME RIDE WITH CM MEETING - 9 PM 25TH AUGUST, 2009, SANDY BAY PARADISE HOTEL. ALL ARE WELCOME.

24 Aug 2009 22:00
25 Aug 2009 22:00

25 TH AUGUST, 2009, WILL BE THE 10TH MEETING WE ARE HAVING. EVERYONE WHO ARE INTO BICYCLING ARE WELCOME TO ATTEND. WE WILL HAVE A HALF HOUR MEETING AMONG G CLUB MEMBERS BEFORE HAVING A CONJOINT MEETING WITH THE ROTARY CLUB.

WE HAVE MADE GREAT PROGRESS. LOTS OF SPONSORS AND OUR MAIN SPONSOR CIMB FOUNDATION MAY BE COMING ABOARD TOO. TOMORROW MEETING WE WILL BE CONCENTRATING ON MAKING THIS EVENT SAFE FOR EVERYONE. WE WILL BE PLOTTING OUT THE FINAL ROUTE AND POSITIONING OF SAFETY PERSONNELS eg. TRAFFIC POLICE, RELAS, ROTARIANS AND G CLUB MEMBERS.

ON THE 1ST OF SEPTEMBER, WE WILL NEED TO PRESENT TO THE CONJOINT MEETING WITH STATE EXCO YB LYDIA ONG, MPPP, JKR, TRAFFIC POLICE AGAIN TO BRIEF THEM ON THE FINAL ROUTE AND SAFETY REQUIREMENTS / EXPECTED FROM THEM.

look368 - Posted on 24 August 2009

T.Bahang / Fruit Farm Ride - 23/8/09

23 Aug 2009 07:30

Date : 23/8/09

Time : 0730am Sharp (try catching up if you are late)

Meeting point : McDonald Sunrise, Gurney Drive

Will have a brief stop at T. Bhang for a short food/drink break before proceeding to Tropical Fruit Farm for fresh fruit juice.

** if rain, ride will be cancelled**

Captain - Posted on 17 August 2009

Ride With CM - Press Conference 22/8/09

22 Aug 2009 10:30

Title : Campaign For A Lane - Come Ride with CM (Press Conference)

Date : 22nd August 2009 (Saturday)

Time : 10.30am

Venue : G Hotel (Salon V)

Members of the press and all sponsors will be invited as well.

All are welcome.

G Club Cyclist 

Captain - Posted on 24 July 2009

CFAL Meeting - 18/8/09

18 Aug 2009 21:00

Weekly CFAL meeting will held again tonight. Detailas follows :-

Date / Time : 18/8/09 @ 9.00pm

Venue : Paradise Sandy Bay Hotel

All are welcome

Captain - Posted on 18 August 2009

Merdeka Ride 16/8/09

16 Aug 2009 07:30

Merdeka Ride will be on third Sunday of August (16/08/09). Don't miss the chance to participate in this spectacular event organised by Lions Club. Register now at Merdekaride!

root - Posted on 25 June 2009

G Club Monthly Bahang Ride - 9/8/09

9 Aug 2009 07:30

G Club monthly Bahang ride is here again. Detains as follows :-

Date / Time : 9/8/09 @ 7.30am

Starting point : G Hotel main entrance

Whole ride will be about 28km round trip.

** If you are game, proceed all the way up to Tropical Fruit Farm for some fresh fuit juices. 

Captain - Posted on 03 August 2009

CFAL Meeting - 4/8/09

4 Aug 2009 21:00

Meeting : Campaign For A Lane - Come ride with CM

Date / time : 4/8/09 @ 9pm

Venue : Paradise Sandy Bay Hotel, Tg Bungah

All are welcome.

Captain - Posted on 03 August 2009

Butterworth Eco Ride 2nd Aug '09

2 Aug 2009 07:30
2 Aug 2009 08:30

Will be riding from Penang to Butterworth on above date.

Meeting point : Fort Cornwallis Car Park

Time : 0730am

Will proceed from there to Butterworth via ferry.

There will be stops for food and drinks.

Total distance : about 50km (flat roads)

**bring along sufficient water n sunblock**

Captain - Posted on 29 July 2009

G Club Meeting - 28/7/09 (9pm)

28 Jul 2009 21:00

G Club's weekly meeting for "Campaign for A Lane, Come Ride with CM"  is here again.

G Club would like to appeal to all to come join in the meeting as we are going to have so much work to do.

Any help appreciated as we are really short of helpers.

Date / Time : 28/7/09 (tuesday) @ 9pm

Venue : Paradise Sandy Bay, Tg Bungah

After the meeting, G Club would be updating Rotary Club of Tg Bungah (Co-Organiser) on the progress as well as see how they can chip in to help as well for the above event.

Hope to see all of you tomorrow.

G Club Cyclist

 

Captain - Posted on 27 July 2009

Monthly Heritage Ride - 26/7/09

26 Jul 2009 08:00

Monthly Heritage Family Ride on 26/7/09

Starts : 0800hrs from Esplanade

Ends : New World Park

Distance : 15km

** T Shirts will be given to early birds. No registeration required. Helmet complusory !! **

Captain - Posted on 21 July 2009

Round Island Ride - 19/7/09 (clockwise)

19 Jul 2009 07:00

Ride starts @ 0700hrs from Tg Bungah heading towards Gurney / Jelutong H'way / B. Pulau / T. Bahang.

For those from P. Tikus / Town Area, wait at G. Drive (Oriental Seafood) or Fort Conwallis roundabout.

There will be stops for drinks and food.

Captain 

 

Captain - Posted on 14 July 2009

Presentation (Joint Meeting) - Ronnie Tan 14/7/09

14 Jul 2009 15:00
14 Jul 2009 15:30

Tuesday, 3 pm, 14/7/09, at Nilam Hall, 53rd floor, KOMTAR, Ronnie Tan will be presenting to the State Exco, MPPP, TRaffic Police, JKR etc regarding the CAMPAIGN FOR A LANE ride on the 18/10/09.

This presentation is meant to synchronise the various department in ensuring the event goes on smoothly. Therefore hopefully as many cyclists as possible could come and support Ronnie and Robert.

look368 - Posted on 09 July 2009

Teluk Bahang Ride 12/7/09

12 Jul 2009 07:30
12 Jul 2009 12:00

Come join us tomorrow 730 am SHARP, meet at G hotel. Captain Ronnie Tan will give a briefing before we start off from Gurney Drive to Tlk Bahang where we will have our breakfast at the roti chanai kopitiam and "sembang" for half an hour  or so before heading back to G hotel. Will probably reach G hotel at about 11 am. For those looking for challenge tomorrow, we have a group of superfit triathlon about 10, who will be riding with us from G hotel, their destination is Tlk Pulau Betong and back to Chinese Swimming Club, run 5 kM and swim again!!! (Caution; No ride if rains; No helmet, no ride ; Ride at your own risk, the G club assume no responsibility for any injury arising from the ride)

look368 - Posted on 11 July 2009

Round Island Ride 11/7/2009

11 Jul 2009 06:30

Come join G CLub for a Round Island Ride coming Saturday.  Meet at Tg Bungah Market 6.30am.  Will take a break at Balik Pulau town kopitiam.  Distance is approximately 70km.  It will be a slow and easy ride.

daniel - Posted on 09 July 2009

Teluk Bahang ride with Thai riders, 5th July 2009

5 Jul 2009 07:30

Ride with the 11 cyclists from Betong, Thailand, to Teluk Bahang Sunday 5th July 2009.  Meet at Macdonald Gurney Drive 7.30am.

daniel - Posted on 04 July 2009

Recent comments

Recent Forum

Recent blogs

Who's online

There are currently 6 users and 9 guests online.

Online users

  • helpdesk
  • bryan886
  • Sifu
  • KNTXX
  • chicken
  • stingray

Who's new

  • stanley870
  • Josef Schien
  • leongfei
  • Lee_L
  • jsws